What it does #
Your organisation gets one gate. It answers a single question about a change: does it introduce a Security Floor issue? If it does, the check fails. If it doesn’t, the check passes.
The gate is deliberately narrow. It isn’t a quality score, a coverage threshold, or a rule-by-rule policy — it’s a floor, and the floor is the set of findings nobody should merge.
It only ever looks at your diff #
This is the part worth understanding, because it decides what the gate can and cannot catch.
A Quality Gate runs on a merge check — the same diff-scoped scan behind pull request checks. It analyses only the files your change touches, and within them it counts only the issues your change introduces. Pre-existing Security Floor issues elsewhere in the repository do not fail the gate.
Two consequences:
- You can turn the gate on without fixing your backlog first. A repository full of existing findings still passes, as long as the change in front of it adds nothing new.
- The gate is not a full security audit. It never looks at files your change didn’t touch. For the whole picture, run a scan and read the Production Ready Score.
When Norma is already checking a commit — because a pull request check is running on it — the gate reuses that analysis instead of scanning twice.
What the Security Floor covers #
The Security Floor is Norma’s list of findings that block certification. Its rules are grouped into five categories.
| Category | What it covers |
|---|---|
| Injection | SQL injection |
| Secrets | Hardcoded credentials, tokens, keys and connection strings |
| Authorization | Row-level security without an identity check |
| Authentication | Endpoints and functions with no authentication |
| Dependencies | Invented, malicious or vulnerable package: a package or version that does not exist, a known malicious package, or a package version with a critical or high vulnerability |
The Gate tab shows these categories with their rule counts, read-only. You can’t edit the condition in this version — every organisation’s gate has the same floor. The Floor and its effect on your score are explained under Production Ready Score — The Security Floor.
Results on GitHub #
The gate publishes the check Norma Quality Gate on pull requests to the reference branch of the repositories you assign to it, with an annotation on each offending changed line.
| What happened | Check result | Blocks a required check? |
|---|---|---|
| The change introduces no Security Floor issue | Success | No |
| The change introduces one or more | Failure | Yes |
| Norma couldn’t analyse the change | Failure, with the reason | Yes |
| The analysis took more than 20 minutes | Failure, reason “timeout” | Yes |
| The pull request comes from a fork | Neutral, with the reason | No |
| The pull request targets another branch | Skipped, with the reason | No |
A failed check doesn’t block anything on its own. GitHub only blocks a merge when the check is required — which you set in a GitHub ruleset, not in Norma.
Setting it up #
- Open Quality Gates in the main menu. The Gate tab shows the Security Floor and the repositories using the gate.
- Add repositories. Only repositories imported through the GitHub App can be added; others appear as not available. A repository that isn’t on the list is never evaluated and gets no check.
- Approve the permission. The CI access tab shows a banner until an owner of your GitHub organisation approves Norma’s
checks: writepermission. Until then the check can’t be published. - Make the check required, if you want it to block merges: in GitHub, add Norma Quality Gate to a ruleset for the branch you protect.
Only organisation admins can change the repository list. Everyone else sees it read-only.
Require the check only on the repositories you assigned. A GitHub ruleset can require a check across every repository in your GitHub organisation. Norma publishes no check for repositories that aren’t on the gate’s list, so a required check would leave their pull requests waiting forever.
Connecting other CI #
A pipeline that isn’t GitHub — or a GitHub workflow that wants the verdict itself — asks Norma directly with a CI API key.
- In Quality Gates → CI access → Other CI (API key), an organisation admin creates a key with a name and an optional expiry.
- Norma shows the key once, with a ready-to-paste pipeline step that requests the evaluation, waits for it, and exits with a status code.
- The key covers every repository on the gate’s list.
Your pipeline sends the repository, the source branch and the head commit; Norma returns an evaluation id and a portal link, and the step polls until the verdict arrives:
| Verdict | When | Exit code |
|---|---|---|
PASSED |
No Security Floor issue introduced | 0 |
FAILED |
One or more introduced | 1 |
NOT_EVALUATED |
Norma couldn’t evaluate, or timed out | 2 |
SKIPPED |
Target branch isn’t the reference branch, or the plan doesn’t include Quality Gates | 0 |
| — | Configuration error: missing, unknown, revoked or expired key; unknown repository; repository not on the gate’s list | 3 |
The result lists the counted issues — severity, impact area, rule, file and line — and never includes a code snippet.
Keys are listed with their creator, dates, last use and state. Revoking one takes effect immediately, and revoked keys stay on the list rather than disappearing. A CI API key is not an MCP key, and the two aren’t interchangeable.
Limits & notes #
- Quality Gates is a paid feature. Which plans include it is set by Quality Clouds; organisations without it see the menu item locked with an upgrade offer.
- If your plan stops including it, Norma publishes the check as skipped on new commits, so a required check stops blocking merges. Your repository list is kept and comes back if the entitlement returns.
- One gate per organisation, with one condition. Multiple gates, observe mode, severity limits and compliance conditions are not in this version.
- GitHub only. Bitbucket repositories can’t be added to the gate yet.
- Forks and other target branches are never blocked — neutral and skipped respectively.
- No verdict line in the pull request comment in this version; the comment and the check are separate surfaces.
Related #
- Merge scans — the diff-scoped scan the gate’s verdict is built on.
- Pull request checks — the comment on a pull request, which the gate is separate from.
- Production Ready Score — the Security Floor and what it does to your score.
- Running a scan — the full-repository scan the gate deliberately isn’t.
- Tiers and quotas — what your plan includes.